Hai Long Offshore Wind Farm – FEED Study

Northland Power and Yushan Energy are developing the 1,044 MW Hai Long Offshore Wind Farm in Taiwan. The park, with a total area of 144.4km2, will be located on the west coast of Taiwan, 50 km offshore from Changhua. Construction is expected to take place in 2021-2024. DEME Offshore has been appointed by Northland Power and Yushan Energy to undertake a FEED Study for the Balance Of Plant scope with a focus on the design, fabrication and  installation of the substructures. Tebeton has supported DEME Offshore with the management of the FEED Study.

  • Location: Taiwan
  • Duration: July 2018 – December 2018